EXP-094REJECTED
Canonical GPU engineering / SHA-256d

P32 priority control microkernel

A high-priority control microkernel can update the cancellation epoch while a long P32 compute kernel is resident.

Claim statusNO END-TO-END MINING ADVANTAGE DEMONSTRATED

Diagnostic work, exact algebra and local capabilities are not treated as end-to-end mining advantage.

Date2026-08-16
HardwareNVIDIA GeForce RTX 5080 · exact CUDA SHA-256d verifier
Run scopePreregistered cancellation campaign with sealed validation and audit
ReproducibilityUse sealed compute/control kernels, confirm the control launch timestamp, and distinguish launch from epoch observation in every trial.
01 / Question & hypothesis

What was tested?

A high-priority control microkernel can update the cancellation epoch while a long P32 compute kernel is resident.

02 / Scientific basis

Why the test is meaningful

CUDA stream priority affects queued scheduling but does not imply mid-kernel preemption when the running grid occupies device resources.

control_response=t_epoch_seen−t_control_launchgate: epoch changes during computelatency target≤15 ms
P32 priority control microkernelVisual reading of the published metrics and gates for EXP-094; it summarizes the registered result, not a mining advantage.EXP-094 / P32 PRIORITY CONTROL MICROKERNELSIGNALS DURING WORK0 / 8CONTROL RESPONSE156.66–157.30 msTECHNICAL AUDITFAILED
FIGURE / RESULT READINGVisual reading of the published metrics and gates for EXP-094; it summarizes the registered result, not a mining advantage.
03 / Method

How it was tested

Launch exact P32 compute, enqueue a minimal control microkernel on a high-priority stream, and timestamp eight attempts while preserving full-domain correctness and paired throughput checks.

04 / Observed result

What happened

Signals during work0 / 8
Control response156.66–157.30 ms
Technical auditFAILED

The control kernel launched but was starved until compute completed. Zero of eight signals were observed during work; responses were 156.66–157.30 ms. Retention was 0.999055 with CI95 0.998749–0.999361.

05 / Validation

Exactness and statistical controls

B32, 2^32 work, zero discrepancies and zero spills passed. The control-path technical gate failed 0/8.

06 / Interpretation

What the result means

Stream priority is not preemption for this resident workload. The mechanism is rejected without an operational campaign.

Limitations

  • The conclusion applies to this occupancy and scheduling configuration.
  • Different cooperative or preemptible kernels are separate hypotheses.
  • Correctness does not rescue failed control latency.
07 / Reproduction

Evidence trail

Use sealed compute/control kernels, confirm the control launch timestamp, and distinguish launch from epoch observation in every trial.

Canonical variants

CANONICAL-EXP-170PREREGISTERED-CAMPAIGNSEALED-AUDIT

Source: internally audited canonical reports. Local filesystem structure, private headers and operational identifiers are excluded from publication.